Project Completion Report

Project Value: £1.9m

Programme Duration: 16 weeks


The backroom space at the rear of Lidl's Tadley store

Project Scope and Delivery

  1. Enabling Works
    • Full internal strip-out of the existing double retail unit, preparing the site for redevelopment.
  2. Structural Alterations
    • Precision saw-cutting to accommodate new internal drainage and freezer slab recesses.
    • Additional saw-cut slab works for pad foundations to support supplementary steels required for calculated roof load capacity.
  3. Roof Works
    • Overlay of existing roof structure covering 2,000m², including soffit and eaves enhancements to extend lifecycle and improve performance.
  4. Building Envelope Enhancements
    • Modifications to external walls and integration of new windows.
    • Installation of a new glazed entrance pod to improve customer access and enhance store frontage.
  5. Internal Fit-Out
    • Comprehensive internal fit-out including full M&E package.
    • Installation of an Air Handling Unit (AHU) system aligned with the client’s technical specification to deliver optimum in-store climate control.
  6. External Works
    • Planing of 3,000m² of existing wearing course and resurfacing.
    • Installation of new 200mm Acco drainage channel and tree pit.
    • Car park resurfacing, relining, and enhancement with new trolley bay and stainless-steel bollards.

Outcome

  • Delivery: Project completed within the 16-week programme and on budget.
  • Quality: All finishes executed to the highest industry standards.
  • Client Satisfaction: The retail fit-out was highly successful, with the client expressing full satisfaction with both the process and the end result.